As part of the London Greenways project, a Cycle Route Implementation and Stakeholder Plan has now been published for the Westminster sections of the Regent’s Canal and the Paddington Branch of the Grand Union Canal.

A shared-use path is recommended along Delamere Terrace.

The replacement of these barriers is recommended along the canalside path in front of the Lisson Green Estate,
The aims of the study were:
The highest-priority recommendations are for contraflow cycling in Blomfield Road and a shared-use path along Delamere Terrace. These schemes will allow the canal route to work in both directions.
Other recommendations include:
The total cost of recommendations made in the report amounts to an estimated £1,676,500.
The executive summary is now available at http://www.westminstercyclists.org.uk/canalcrisp.htm Please email info at westminstercyclists.org.uk for the full 7.4MB report.

Following construction of two new gates by the Royal Parks, the cycle route around Hyde Park now connects to the toucan crossings of Marble Arch.
You are advised to use these gates rather than the one onto Park Lane, where cycling is not allowed on the footway and you could be fined - see photo below.